What Is the Best Way to Set Up High Level Frame Scaffolding in Projects

Adopted by the build-up of high-level frame scaffolding,all must meet the quality requirements of various materials.
High-level frame scaffolding foundation must be strong, before the erection of the computation, meet the requirement of load, and set-up, and according to the construction of drainage measures.

Frame scaffolding, technical requirements should comply with the regulations of relevant specification.
Must attach great importance to all kinds of structural measures: bridging, node, etc.
Shall be set up according to requirements.
Level is closed: should be the first step, every step or two steps, be put with frame scaffolding plank hand or foot basketry, frame scaffolding to laid along, overlapping joint should be shelved in a small bar, it is forbidden to appear short board. And in every four step laid between stud and wall system bottom has long security.

Vertical closed: mobile frame scaffolding safety requirements in the second step to step 5, each step all needs to the stud unavoidably side set up in 1.00 m high protective railings and pedal or set up network, protective pole (network) and vertical pole pin down; Step 5 above in addition to the set a guard rail, set net should be all set its safety or security; In concentration areas or residents along the street, it should be the second step, the outside all set net set its safety or security.


Frame scaffolding shall be higher than the top of the building or operating surface more than 1.5 m, and added a palisade.
Of frame scaffolding erection of steel pipes, fasteners, frame scaffolding and connections shall not be arbitrarily dismantled. Construction when necessary, must be subject to consent by the site, head, and take effective measures to process is completed, immediately recover.