Construction safety management: scaffolding demolition of safety technical measures

Construction safety management: scaffolding demolition of safety technical measures
1. Open frame before, comprehensive inspection plans to dismantle scaffold, according to the results of the inspection to formulate a work plan, submitted to the approval, after technical clarificaiton work. Work plan generally includes: down the steps and methods, safety measures, materials piled up in the place, labor organization arrangement.
2. The frame should be divided into areas, around a rope tied erected a fence or warning signs, the ground should be designated persons command, prohibit the operation personnel to enter.
3. Open the heights of the aircraft operating personnel should wear safety helmet, wear your seat belt, chaps, wear soft bottom antiskid shoes.
4. Open frame program shall comply with the "top-down, after a first" principle, namely the first safety net, railings, scaffolding, bracing, even the wall bar, and then open the ledger, small bar, post, etc., and according to the principle of "one step". It is forbidden to up and down disassemble frame work at the same time.
5. Open poling, want to embrace poling first, then open the last two clasp, demolition of the ledger, bracing, should be dismantled the middle buckle, then hold the middle, and end button.
6. Even the wall bar (nodes) should with dismantling progress step by step a demolition, tossing the brace, should set up a temporary support, and then removed.
Dismantled to a unified command, echoed up and down, coordination, when untied the knot buttons associated with another person, should first notify the other party, in case of falling.
8. Collision is forbidden as scaffold near the power cord, to prevent electric shock accident.
9. The open frame, not to change horses in the middle of the stream, if must change, should be disabled account rear can leave.
10. Remove the material to slowly next shipment, it is forbidden to throw. To the material of the ground should be according to the designated place with open with luck, the classification of stacking, qing "" on the day of the day, remove the fastener and the wire will focus on recycling.
11. High-rise building scaffolding removed, device shall be equipped with good communication.
12. Delivery to the ground bar, should be timely according to the kind of stacking, sorting maintenance.
13. Leave on the same day, should be timely reinforcement has not been dismantled parts, to prevent the danger caused by finally settle after the accident.
14. In case of strong wind, rain, snow and other special climate, not for the removal of scaffolding, it is strictly prohibited to dismantle at night.
15. Standing position should be paid attention to when lifting scaffold board, and shall erect, since the outgoing in turn prevent eversion to not remove the residue of scaffolding fall from a height.