Construction safety management: frame scaffolding procedures

Construction safety management: frame scaffolding procedures
1) scaffold erection, shall end extends to the other end, step by step from bottom to top mounted, and can change the direction of the erection, step by step to reduce error accumulation. Since the ends to thrust build-up or alternate with, in order to avoid dislocation junction, difficult to connect.
2) the order of the scaffolding. Laid mat technique (plate) - Ann people base - stand up since the end door frame and then cross support to pipe installation level frame (or scaffold board) to install the steel ladder, horizontal reinforcing bar - > installation rod according to the above steps, the wall installed resulto - in accordance with the provisions, location bridging step to assemble the top rail.
3) scaffold erection must cooperate with construction progress, an erection height should not exceed the top three or even the wall free height is less than 6 m, to ensure that the scaffold is stable.


评论

  1. We provides a best scaffold to all industries with the wide range of sizes from industrial building, towers to large scale applications.
    Garbage chute saskatchewan
    Mobile scaffolding platforms thompson

    回复删除

发表评论

此博客中的热门博文

The International Steel Market is Still Oversupplied

Scaffolding Planks in Lancashire:The Factors Related to Quality of Scaffolding Planks?