Type frame scaffolding, specification and construction process

Type frame scaffolding, specification and construction process

Scaffold door is the door frame, cross support, connecting rod, hanging button scaffolding or horizontal planes, arm lock and so on basic structure, set up horizontal reinforcing rod, bracing, sweeping bar, sealing bar, bracket and base, and USES the even wall connected to the main body structure of a standard steel tube scaffold. Door type steel pipe scaffold outside not only can be used as a scaffold, also can be used as a scaffold or bunch of scaffolding.
Type door scaffolding purposes
1. Used for buildings, halls, Bridges, overpass, tunnel and other template supporting roof or fly die inside the frame.
2. As high-rise buildings, both inside and outside gate scaffolding.
3. Used for mechanical and electrical installation, ship hull building and other decoration engineering activities of the working platform.
4. Use doors scaffold with simple roof, can constitute a temporary site dormitory, the warehouse or barrack.
5. Used for erection of temporary balcony and stand.
Door type scaffold dimensions
The size of doors scaffold is various countries around the world, there are two units adopt the international unit and imperial. Such as English unit width is 4 '1219 type door frame (1219 mm), height is 6' 4 "(1930 mm), type 1219 international units of the width of the door frame is 1200 mm, height is 1900 mm. The main door frame width scaffolding companies abroad are 900, 914, 1200, 1219 mm, the height of the door frame size a lot, become a system oneself.
Type door scaffolding, specification
(a) the construction plan
1. The door frame selection should be based on the structure of the shape, height and determine the operation condition, and draw the erection construction and detail drawing.
2. The scaffolding, highly generally limits under 45 m. Four layer height under the 20 m, but at the same time homework; Heights under 35 m to three layers of homework at the same time; Height below 45 m at the same time two layers of homework. When reducing the construction load and narrow wall pole spacing, scaffolding, height is increased to 60 m.
3. When the scaffolding, height more than 60 m, should carry on the design and calculation, the segment erection method. The design calculation shall be approved by the technical department or general.
(2) the frame body
1. The vertical bar for should level off is solid.
(1) the erection height under 25 m, the original soil compaction, the mat 5 cm thick boards.
Set-up in 25 ~ 45 m (2), the original soil compaction, the upper 15 cm honest slag cement, then spreads board or channel.
(3) the erection height more than 45 m, response to calculate and determine the design.
Step 2. At the bottom of the door frame bottom set sweeping bar, used to adjust the uneven settlement and reduce the door frame.
(3) the shelf stability
1. The inside and outside of the door frame shall be set up cross support, its size should match the door frame spacing, and fastens its stud with the door frame.
(1) even the wall of Settings: high frame 45 m, 6 m or less vertically, up every two layers, the level of 8 m or less; 45 ~ 60 m high, vertical 4 m or less (each floor), level 6 m or less, and should comply with the rules.
Set of requirements: aircraft (2) the level of 45 m high, every two steps set a door frame; 45 ~ 60 m, rack high level should be each door set a. (when hang buckle type scaffold board is used, not set level frame).
2. Even the setting should be in accordance with the provisions, spacing of wall with a simultaneous scaffolding shall not leak. Even the wall of a rigid approach should be adopted, the bearing capacity of not less than 10 kn, near the door beams and Settings. Scaffolding corner and one word or not closed all scaffold should add the wall on both ends.
(3) bracing set requirements:
More than 20 m high (1) the scaffolding, should every step 4 is set on the outside of scaffolding, and form a level BiGeJuan. Along the scaffold bracing height and erection of scaffolding synchronization.
(2) bracing width is 4 ~ 8 m, 45 掳 ~ 60 掳 Angle with the ground.
(3) bracing extension using lap, lap length should be 50 cm or more, with the two buckle fastened up.
4. Scaffolding, compatible with body height, an erection height should not exceed the upper wall point with more than two step (or free height 4 m or less). Scaffolding set-up with correction with the verticality, deviation should be along the longitudinal vertical metope H / 600 and 500 mm or less for scaffolding height (H). First door frame should be strictly controlled the vertical degree and levelness, make the door frame stud in two directions vertical deviation within 2 mm, top horizontal deviation control in less than 5 mm. Installing a door frame, door frame stud alignment, up and down of the deviation should not be greater than 3 mm.
(4) rod, lock
1. Different products door frame and spare parts shall not be mixed. The door frame assembly must be set up and down connecting rods and arm lock. Reinforcement, bracing, and even the wall parts installation must be simultaneous with the scaffold.
2. The door frame inside and outside all cross support should be set up, and with the lock pin lock on the door frame stud in mind, because construction requirements need to dismantle the inside of the cross, should set the level under the door frame unit, frame, construction has been completed, immediately restore cross support to guarantee the stability of the frame body.
The door frame installation should be from one end to the other end, should not be allowed to, and after take a plane, check the adjust the levelness and verticality. Various parts of arm lock, toggle hook must be in locked state.
(5) scaffold board
1. The operation layer shall continuously spread button scaffolding, scaffolding should toggle hook and fasten the door frame beams, with a sliding baffle lock.
2. When using other general scaffolding, scaffold board and door frame rail should be with a lead wire tie, it is forbidden to appear probe plate. Each step along the scaffold height setting a reinforcement or set level, strengthen the stability of the scaffold.
(6) disclosure and acceptance
1. Before the scaffold erection, head should be in accordance with the requirements of the construction scheme, construction combined with the construction site conditions and team, do detailed disclosure, and commanders were determined.
2. Scaffolding, should by construction, organize relevant personnel to attend, head shall be carried out in accordance with the construction plan and specification requirements, item by item check acceptance, determined to meet the requirements, the can be put into use.
3. The scaffold inspection acceptance shall be stipulated in the specification, that do not conform to the provisions of the rectification immediately, the result of the inspection and rectification, should make records according to the measured data, and signed by the inspectors.
(7) the frame body protection
1. The operation layer of the lateral shall in accordance with the requirements of border guard in the set two protective railings and baseboard, prevent fall and researchers working on scaffolding material finishes.
2. The outer edge of the scaffold shall be in accordance with the provisions, setting the mesh net. Federated eye network must use the appropriate tether will net around every 45 cm () between each ring fastened on the foot hand lever.
(eight) material
1. Six specifications, quality and its accessories should comply with the provisions of the "door type steel pipe scaffold JGJ76, and should have the factory certificate of quality and product logo.
2. The door frame out-of-plane bending should be 4 mm or less, but slight corrosion, stud spacing in the in - + 5 mm, other parts bending should be 3 mm or less, there is no crack, slight corrosion for qualified, or standard as stipulated in the specification test.
3. The general quality inspection according to different conditions can be divided into a, b, c three categories.
Class a: there was a slight deformation, damage, corrosion, after simple treatment, paint maintenance may continue to use again.
B: a mild damage, deformation and corrosion, but the straightening, flat, replacement parts, repair, rust removal, paint, etc., may continue to use.
Class c: the main bearing bar deformation serious, corrosion area of more than 50%, has exfoliate can't repair and the performance test can not meet the requirements, should be scrap processing.
(9) load
1. Door type scaffold construction load: 3 kn/m structure, decorative frame 2 kn/m2. The construction of the scaffold material piling quantity and homework personnel should not exceed the prescribed.
2. Avoid the concentrated feed and heavy equipment, to prevent the distortion of scaffolding and scaffolding fracture.
3. The scaffolding and at the same time there are more than two operation layer, layer within a frame from homework construction combined uniformly distributed load shall not exceed 5 kn/m2.
(10) channel
1. Prohibit any climbing on the outside of scaffolding, not only prone to accidents, and at the same time due to the rigidity of cross sustaining poor, affect the normal use of scaffolding after deformation.
2. The door frame with steel ladder accessories, specifically for providing workers use the up and down, the steel ladder beam, pedal, toggle hook, etc. Steel ladder hanging buckle up and down in the adjacent two steps on the door frame rail, with rail by non-skid baffle lock is firm.