Cuplock scaffolding safety codes

Cuplock scaffolding safety codes

The advantages of Cuplock scaffold
1, multi-function, can according to the specific construction requirements, different team frame size, shape, and the bearing capacity of single and double row scaffolding, racks, sticks, material hoisting frame, climbing scaffolding, cantilever rack and other functions of construction equipment. Can also be used to build facilities barrack, tents, lighthouse and other structures. Particularly suitable for erection of scaffold surface and reloading the racks.
2, efficacy: commonly used in the bar up to 3130 mm, weighing 17.07 KG. Whole frame assembled demolition speed is faster than conventional 3 ~ 5 times, spell quickly down the save Labour, workers with a hammer to complete all assignments, to avoid the bolt operation bring so much inconvenience.
3, with strong sex: the main components adopt common fastener type steel pipe scaffold pole, available fastener with ordinary steel pipe connection, strong commonality.
4, large bearing capacity, vertical rod is connected with the axis of socket, rail with stud on the bowl joint connection, connection with reliable bending, shear and torsion resistance performance. And axis to the bar a little bit, node within the frame plane, therefore, the structure is stable and reliable, large bearing capacity.
5, safe and reliable: connector design, considering the bowl on the screw friction force and the gravity, make joint has reliable self-locking ability. Under the load acting on the bar by bowl is passed to the stud, the bowl has a strong ability of shear. On the bowl even if is not pressure, rail joint also does not emerge and cause an accident. At the same time equipped with a safety net support, between rail, scaffolding, baseboard, ladder. Liang. Even the wall bracket rod accessories, such as the use of safe and reliable.
6, not easily lost: the scaffolding without scattered easy loss of fasteners, to reduce the loss to the minimum extent.
7, less maintenance: the scaffolding components to eliminate the bolt connection. Resistance component by touch upon. General corrosion does not affect the spell dismantling homework, do not need special maintenance, maintenance.
8, transportation: the longest scaffolding 3130 MTM components, the heaviest component 40.53 KG, easy to handle and transport.
The disadvantage of bowl scaffold
1, rail for several size shape, stud on the bowl node according to the 0.6 M spacing, make the frame size limit.
2, u-shaped pin is easy to lose.
3, the price is more expensive.
The Cuplock scaffold specifications
Full Cuplock bowl frame scaffold. Divided into bar and rod.
Bar of the specifications of the commonly used are:
HG - 60, HG - 90, HG - 120, HG - 150
Poling of the specifications of the commonly used are:
LG - 300, LG, LG, LG - 240-240-150, LG, LG, LG - 120-120-60
Bowl scaffold theory weight
Bowl scaffold theory weight 7.6 kg, choose different USES of different types of construction scaffolding and formwork. Bridge support rack bowl of scaffold, has used the door scaffolding. The main structure of scaffold for construction land use fastener scaffold, scaffolding poling of the longitudinal spacing generally 1.2 ~ 1.8 m; Horizontal distance average of 0.9 ~ 1.5 m.
Price of bowl scaffold
Cuplock scaffold in about 10 yuan to 10000 yuan. Due to the price difference is bigger, recommend before buying, might as well go to the store under investigation.
Note: this price is for reference only! Due to the different region, and of course the price also will be different. If you want to know more related price details, please refer to our local dealers.
Cuplock scaffold safety codes
On layer 1, homework should comply with the design requirements, the construction of load shall not be overloaded, shall not be concentrated on scaffolds stack template, steel and other materials.
2, the conveying pipe, placing boom and tower Rachel cable wind rope shall not be fixed on the scaffold.
3, large template shall not be stored directly on the scaffold.
More than 4, in grade 6, and wind, rain and snow, heavy fog weather should stop when the scaffolding set-up and dismantling of homework.
5, during the use of scaffolding, strictly forbid dismantle bar frame structure, such as to be agreed removed must be submitted to the technical director, determine after remedial measures can be implemented.
6, it is strictly prohibited in the scaffold and adjacent foundation mining operations.
7, the scaffold should keep a safe distance from overhead transmission line, construction site temporary electricity line construction and scaffolding grounding lightning protection measures.
8, after use of scaffolding components should be cleared surface bonding ash, calibration bar deformation, surface after make antirust processing.