Housing construction project: steel pipe scaffolding dismantling requirements
Housing construction project: steel pipe scaffolding dismantling requirements
Scaffold dismantling operations should be removed from top to bottom layer by layer, not allowed to be removed at the same time two layers. Each layer is first removed and the structure of the rod, and then removed the frame body. After the end of the first layer of the construction of the next layer.
Each layer should be removed before the first layer of the material on the shelf, garbage and other items cleared clean, and the closure of the outer frame with a safety net removal.
The removal process to remove the small bar, a large bar, and then remove the pole and scissors.
Should loosen the connection rod parts timely demolition away dismantling process, avoid error and error by rotary loose connection rod.
Remove the rod parts, shorter than 3 meters into the first floor, 3 meters longer than the manual transmission to the ground, no throw down.
In the process of dismantling, should be well coordinated and coordinated action to prohibit the removal of heavy bars and other dangerous work.
http://www.hunanworld.com/product/
Scaffold dismantling operations should be removed from top to bottom layer by layer, not allowed to be removed at the same time two layers. Each layer is first removed and the structure of the rod, and then removed the frame body. After the end of the first layer of the construction of the next layer.
Each layer should be removed before the first layer of the material on the shelf, garbage and other items cleared clean, and the closure of the outer frame with a safety net removal.
The removal process to remove the small bar, a large bar, and then remove the pole and scissors.
Should loosen the connection rod parts timely demolition away dismantling process, avoid error and error by rotary loose connection rod.
Remove the rod parts, shorter than 3 meters into the first floor, 3 meters longer than the manual transmission to the ground, no throw down.
In the process of dismantling, should be well coordinated and coordinated action to prohibit the removal of heavy bars and other dangerous work.
http://www.hunanworld.com/product/
评论
发表评论