(1) the scaffold should be covered, spread, leave the metope of 120 ~ 150 mm.
(2) the docking or lap shall conform to the norms. Scaffolding probe diameter of 3.2 mm galvanized steel wire fixed on the supporting rods.
(3) in the corner, ramps platform of scaffold board and mouth should be connected to the transverse horizontal pole reliable, prevent slippery.
(4) from the top operation layer under the scaffolding of plan, appropriate every 12 m spread a layer of scaffolding.
(1) the scaffold should be covered, spread, leave the metope of 120 ~ 150 mm.
(2) the docking or lap shall conform to the norms. Scaffolding probe diameter of 3.2 mm galvanized steel wire fixed on the supporting rods.
(3) in the corner, ramps platform of scaffold board and mouth should be connected to the transverse horizontal pole reliable, prevent slippery.
(4) from the top operation layer under the scaffolding of plan, appropriate every 12 m spread a layer of scaffolding.