Mobile scaffolding when installation should pay attention to the following questions

Mobile scaffolding when installation should pay attention to the following questions:
1, columns, steel tube mobile scaffold should be placed on a solid foundation, column steel pipe padded seat, with concrete block or with a thick solid wood cushion, and wood (pad) is not suitable for high-rise building appropriate rod clings firmly sweeps the floor.
2, mobile scaffolding vertical post requirements, including the vertical error of corner column must not exceed 0.5%, which column should not exceed 1%, eight facade mobile scaffolding column spacing shall not be greater than 2 m, the level of the longitudinal steel pipe vertical spacing is not more than 1.8 meters, and will bind with artifacts, tighten bolts, bearing longitudinal rod, must be supported on the bar, to disable the unqualified material.
3, mobile scaffolding on both ends of the corner, every six to seven columns, should establish bracing, bracing no greater than 60 degree Angle with the ground, building anchor points, horizontal one anchor point is set every 4 meters, must in the anchorage point Rachel solid buildings. Civil building eight layer (22.5 meters) above the mobile scaffolding used haul, work safety net as the layer to be in complete set (one), the level of net every four floor, first floor must be according to the channel length erection of safety net.
(4), the channel must be put with scaffolding plank, shall not leave gaps and probe plate, skirting board, all ceiling application binding wire and firm, feeding chute slope shall not be greater than 1:3, the width should not be less than 1.5 meters, master cheng yen oblique bridge slope shall not be greater than 1:2, prevent slippery spacing with 30 centimeters advisable, but not more than 35 centimeters.
5, use as far as possible to achieve unity of steel pipe specifications, different specifications of the steel pipe should be stacked, respectively use, appropriate USES 51 mm steel pipe diameter and wall thickness 3-4 mm, wall thickness less than 3 mm steel tube, for columns and cross bar.
6, outer shelf must be kept above 1.2 meters above the working face, temporary channels to build protective railings on both sides.
7, the bent frame build-up section, after the completion of construction, to the branch of Abe's acceptance, and be submitted to safety qualified rear can use, and the acceptance formalities by the regulation.