In high-rise building construction, every step outside the frame to be paved with bamboo basketry or steel fabric, in addition to deaden 1 m high railing and standing bamboo basketry board. On the outer edge of the scaffold, set up safety set net.
Second, the floor protection measures. Now most of the high-rise buildings are concrete frame constructions, widespread adoption MS pipe scaffolding support steel formwork construction. In order to do the protection of the floor construction, can use floor frame. Guard is equal to the height of the two floors of the building, protecting frame width is equivalent to the length of the building a studio.(floor care on the scaffolding tube can prevent falling to the lateral personnel construction, can also be used as a construction safety channel.)
Three, floor slanted protective measures Some concrete frame building, caused by a lack of hoisting equipment, inconvenient installation floor frame, using steel formwork support. Preferably in the surrounding buildings, the erection slanted plane, vertical height and construction of building height, the same set-up of ledger, carry on oblique one safety net. (the floor is slanted frame, also can prevent the staff falling to the outside, but in the build-up to pick frame, workers have to switch seat belt) four, socket frame protection measures.
Some high-rise building, using the plug in or the ingate cast-in-place reinforced concrete shear wall construction method, in order to ensure the safety of construction personnel. Tool type socket frame can be used, the height of the socket frame over a layer of floor, can prevent the construction layer surrounding the staff fall outward.
In high-rise building construction, every step outside the frame to be paved with bamboo basketry or steel fabric, in addition to deaden 1 m high railing and standing bamboo basketry board. On the outer edge of the scaffold, set up safety set net.
Second, the floor protection measures. Now most of the high-rise buildings are concrete frame constructions, widespread adoption MS pipe scaffolding support steel formwork construction. In order to do the protection of the floor construction, can use floor frame. Guard is equal to the height of the two floors of the building, protecting frame width is equivalent to the length of the building a studio.(floor care on the scaffolding tube can prevent falling to the lateral personnel construction, can also be used as a construction safety channel.)
Three, floor slanted protective measures Some concrete frame building, caused by a lack of hoisting equipment, inconvenient installation floor frame, using steel formwork support. Preferably in the surrounding buildings, the erection slanted plane, vertical height and construction of building height, the same set-up of ledger, carry on oblique one safety net. (the floor is slanted frame, also can prevent the staff falling to the outside, but in the build-up to pick frame, workers have to switch seat belt) four, socket frame protection measures.
Some high-rise building, using the plug in or the ingate cast-in-place reinforced concrete shear wall construction method, in order to ensure the safety of construction personnel. Tool type socket frame can be used, the height of the socket frame over a layer of floor, can prevent the construction layer surrounding the staff fall outward.