Scaffolding Information Scaffold checklist


Scaffolding Information Scaffold checklist

This guide is intended to clarify when scaffold design is required and what level of training and competence those erecting, dismantling, altering, inspecting and supervising scaffolding operations are expected to have obtained.

Design and inspection issues

Unless a scaffold is a basic configuration described in recognised guidance e.g. NASC Technical Guidance TG20 for tube and fitting scaffolds or manufacturers’ guidance for system scaffolds, the scaffold should be designed by calculation, by a competent person, to ensure it will have adequate strength and stability.All scaffolding should be erected, dismantled and altered in accordance with either NASC guidance document SG4 for tube and fitting scaffolds or the manufacturers’ erection guide for system scaffolds.For scaffolds that fall outside the scope of ‘Basic Scaffolds’ as described in bullet point 1, the design information should describe the sequence and methods to be adopted when erecting, dismantling and altering the scaffold, if this is not covered by published guidance as detailed in bullet point 2.Any proposed modifications or alterations outside a generally recognised standard configuration should be designed by a competent person.Handover certificates should refer to relevant drawings, permitted working platform loadings and any specific restrictions on use.All scaffolding inspection should be carried out by a competent person whose combination of knowledge, training and experience is appropriate for the type and complexity of the scaffold he is inspecting. Competence may have been assessed under The Construction Industry Scaffolders Registration Scheme (CISRS) or an individual may be suitably experienced in scaffolding work and have received additional training under a recognised manufacturer/supplier scheme for the specific configuration he is inspecting.A non-scaffolder who has attended a suitable scaffold inspection course and has the necessary background experience would be considered competent to inspect a basic scaffold (ie a site manager).The scaffold inspection report should note any defects and corrective actions taken, even when those actions are taken promptly as this assists with the identification of any recurring problems.To prevent use by unauthorised persons of incomplete scaffolds, relevant warning signs identifying the areas where access is not permitted should be displayed at the access points to these areas. In addition, access to the incomplete areas should be prevented by suitable physical means.

评论

此博客中的热门博文

The International Steel Market is Still Oversupplied

Scaffolding Planks in Lancashire:The Factors Related to Quality of Scaffolding Planks?